We shaved 22 minutes per frame on 12‑meter truss assemblies last month by moving fit-up 4 m closer to the gantry and locking in a 1.2 mm root gap per WPS, but I’m watching to be sure distortion doesn’t creep past ±1.5 mm. Anyone else pushing takt like this — what checks are you running in-process so speed doesn’t spike your NCRs?